In 2014/2015, we worked with ATC, carrying out the works below:
- 20 assembly of towers, totaling 228 tons of metallic structure
- 1 shared greenfield site (COLLO) in the state of BA
- 153 percussion soil drilling reports
- 158 Vertical Structure mappings with all technical and design details
- 155 Foundation mappings with all technical and design details